Work Club Spencer
Building Engineering
Berwick Fabrications delivered a large scale mild steel partition and door fit-out for the Work Club Spencer project, spanning two full levels of the building.
The scope included custom mild steel wall partitions and doors, tack welded to match the Work Club design and finished in a two coat Penetrol oil finish, complete with stainless steel butt hinges. Level 19 included a full run of standard and arch doors alongside extensive wall partitioning, with Level 20 following the same design and finish across its own set of doors and partitions.
Our team managed fabrication and installation across both levels to deliver a consistent, high-quality finish in line with the client's design specifications.